Filter discussions based on popular tags
Popular Tags
Browse all discussion posts based on their category
Discussion Categories
Can't find the Answer you were looking for? 
  
Question
7 page views
How long does ADU construction take in Los Angeles, California?
Category: Business
Tags: 
  • Reviews
    0 Reviews
  • Answers
    2 Answers

11/10/2025 8:41 AM (PST)

I’ve been planning to build an ADU behind my house in Los Angeles, but I’m not sure how long the whole process actually takes. My neighbor started his last year and it seemed like it dragged on forever. I’d like to get a realistic idea before jumping in — from permits to final inspection, how long does ADU construction usually take in Los Angeles, California?

» Send Kudo  |  » Private Message  |  » Mark as Spam
 
Replies: 1
  • Reviews
    0 Reviews
  • Answers
    8 Answers

11/10/2025 9:05 AM (PST)

It really depends on the type of ADU you’re building and how smooth the permit process goes. When I built mine, it took about 7 months total — 2 months for permits and around 5 months for construction. Some prefab units go faster, maybe 3–4 months. If you’re going for a custom design, expect it to take longer because of plan checks and possible city revisions. I used https://www.aduscale.com/adu-construction-in-los-angeles to estimate my timeline and get guidance, and they were pretty accurate about each stage. It helped me plan around inspections and avoid delays with contractors.

» Send Kudo  |  » Private Message   Is this helpful? (0)   (0)
Page Top ↑
What's your opinion?
Enter Your Reply
  You must register or sign in to your user account before posting on Ask The Community.
 
 
© Copyright 2025 TrustLink All Rights Reserved.