Proper assembly begins with excavating a level trench floor and establishing correct depth requirements according to engineering designs. Installers place bottom units on level ground, insert conduits securely, and lock upper tiers into place progressively. Maintaining recommended axial spacing intervals along the duct run prevents line sagging between support locations. Technicians verify vertical and horizontal alignment before securing the entire assembly against movement during concrete pouring or soil backfilling. Following precise installation protocols ensures frictionless cable pull-through and prevents costly structural repairs after backfilling.