Proper installation starts with excavating the trench to the required depth and compacting the soil bed until it is completely flat and free of sharp stones. Technicians place base units of the HDPE Duct Spacer along the trench floor at uniform intervals, usually spaced every 1.5 to 2 meters. The first row of conduits is seated into the curved cradles, and intermediate spacers are snapped onto the top to support the next layer. Workers repeat this stacking process until the full multi-layer matrix is assembled. Finally, ties or locking pins secure the assembly before concrete pouring or controlled soil backfilling takes place.